Date |
Standard |
Name |
Length |
Stage |
|
1983-10-04 |
M |
M7 Jct 9-10 Naas |
7 |
Complete |
|
1985-xx-xx |
M |
M1 Whitehall-Jct 1-2 Santry-Airport |
5.5 |
Complete |
|
1990-03-xx |
M |
M50 Jct 6-7 N3-N4 |
3.2 |
Complete |
|
1990-05-02 |
M |
M50 Jct 7-9 N4-N7 |
4.6 |
Complete |
|
1990-12-17 |
M |
M50 Jct 9-11 N7-N81 |
4 |
Complete |
|
1991-06-xx |
HQDC |
N6 Jct 8-13 Athlone BP |
9 |
Complete |
|
1991-10-24 |
M |
M11 Jct 3-6 Bray |
5.5 |
Complete |
|
1992-04-03 |
M 2 |
M8 Jct 18-19 Glanmire |
7.5 |
Complete |
|
1992-11-02 |
HQDC |
N3 M50-Clonee (S Section) |
5.5 |
Complete |
|
1992-11-02 |
M 2 |
M3 M50-Clonee (N Section) |
2.1 |
Complete |
|
1993-06-16 |
M |
M7 Jct 10-12 M7/M9 Newbridge (Naas-Newbridge) |
8 |
Complete |
|
1993-10-xx |
M |
M1 Jct 11-13 Dunleer |
6.5 |
Complete |
|
1994-03-04 |
HQDC |
N4 Jct 15-17 Mullingar BP |
3 |
Complete |
|
1994-10-24 |
M |
M9 Jct 1-2 M7/M9 Newbridge (Newbridge-Kilcullen) |
6 |
Complete |
|
1994-12-19 |
M |
M4 Jct 5-8 Leixlip-Kilcock |
17.6 |
Complete |
|
1996-12-xx |
M |
M50 Jct 3-6 M1-N3 |
11 |
Complete |
|
1997-05-29 |
M |
M7 Jct 16-18 Portlaoise |
12.5 |
Complete |
|
1998-01-26 |
HQDC |
N4 Sligo-Collooney |
7.5 |
Complete |
|
1998-10-12 |
M |
M1 Jct 5-7 Balbriggan |
13 |
Complete |
|
1999-01-29 |
M 2 |
M11 Jct 20-21 Arklow BP |
6.8 |
Complete |
|
1999-05-21 |
HQDC |
N25 Jack Lynch Tunnel |
12 |
Complete |
|
2001-01-26 |
M |
M1 Jct 13-16 Dunleer-Dundalk |
16 |
Complete |
|
2001-04-20 |
D2AP |
N20 Blackpool BP |
2.5 |
Complete |
|
2001-07-12 |
M 2 |
M20 Patrickswell to Limerick |
9.5 |
Complete |
|
2001-07-31 |
M |
M50 Jct 11-13 N81-Ballinteer |
9 |
Complete |
|
2002-09-30 |
M 2 |
M18 Jct 10-11 Newmarket on Fergus BP |
6 |
Complete |
|
2003-02-03 |
M |
M4 Jct 6 Celbridge |
0 |
Complete |
|
2003-06-09 |
M |
M1 Jct 7-11 Drogheda |
22 |
Complete |
|
2003-06-28 |
M |
M1 Jct 2-5 Airport-Balbriggan |
16 |
Complete |
|
2003-09-12 |
M 2 |
M8 Jct 17-18 Watergrasshill |
10 |
Complete |
|
2003-10-22 |
D2AP |
N11 Jct 8-10 Glen of the Downs |
5.5 |
Complete |
|
2003-11-07 |
M 2 |
M18 Jct 9-10 Hurler's Cross (N of N19) |
3.6 |
Complete |
|
2003-11-07 |
HQDC |
N18 Jct 8-9 Hurler's Cross (S of N19) |
3.1 |
Complete |
|
2003-12-08 |
M |
M7 Jct 12-14 Kildare |
12 |
Complete |
|
2004-05-31 |
M 2 |
M7 Jct 28-30 Limerick BP Ph.1 |
10 |
Complete |
|
2004-09-27 |
D2AP |
N11 Jct 13-14 Rathnew / Ashford Bypass (N&S Sections) |
5.7 |
Complete |
|
2004-09-27 |
M 2 |
N11 Jct 14-17 Rathnew / Ashford Bypass (Central Section) |
8 |
Complete |
|
2004-09-20 |
HQDC |
N22 Ballincollig Bypass |
11.7 |
Complete |
|
2004-10-11 |
M 1 |
M8 Jct 7-9 Cashel BP |
7 |
Complete |
|
2004-11-08 |
M |
M7 Jct 14-16 Monasterevin |
17 |
Complete |
|
2005-06-30 |
M |
M50 Jct 13-17 Ballinteer-M11 |
11.4 |
Complete |
|
2005-07 |
M 2 |
M4 Jct 12-13 McNeads Bridge to Kinnegad |
6.8 |
Complete |
|
2005-09-26 |
M |
M1 Jct 16-18 Dundalk |
11 |
Complete |
|
2005-10 |
M |
M50 Jct 15 Carrickmines |
0 |
Complete |
|
2005-12-12 |
M |
M4 Jct 8-12 Kilcock-Kinnegad |
36.8 |
Complete |
|
2005-12-12 |
M |
M6 Jct 1-2 M4 Kilcock-Kinnegad (M6 section) |
1 |
Complete |
|
2006-01 |
M |
M1 Jct 3 Drynam |
0 |
Complete |
|
2006-05-24 |
HQDC |
N2 Ashbourne BP - M50 (S Section) |
4 |
Complete |
|
2006-05-24 |
M 2 |
N2 Ashbourne BP - M50 (N Section) |
13 |
Complete |
|
2006-08-15 |
Widening to D3AP |
N7 Jct 4-9 Rathcoole-Naas Widening from 4 to 6 lanes |
15 |
Complete |
|
2006-10-02 |
M |
M8 Jct 14-17 Fermoy |
18 |
Complete |
|
2006-10 |
HQDC |
N25 Kinsale Rd GS |
3 |
Complete |
|
2006-12-05 |
M 1 |
M6 Jct 2-4 Kinnegad-Kilbeggan (Kinnegad-Tyrellspass) |
19 |
Complete |
|
2006-12-20 |
M |
M50 Jct 1-2 Dublin Port Tunnel |
6 |
Complete |
|
2007-01-26 |
M 2 |
M18 Jct 11-14 Ennis BP |
14 |
Complete |
|
2007-05-16 |
M 1 |
M6 Jct 4-5 Kinnegad-Kilbeggan (Tyrellspass-Kilbeggan) |
9 |
Complete |
|
2007-07-04 |
M 2 |
M11 Jct 22-24 Arklow Gorey Bypass (Gorey BP) |
13.5 |
Complete |
|
2007-08-02 |
HQDC |
N1 Jct 18-20 Dundalk-Newry |
10 |
Complete |
|
2007-09-05 |
M 2 |
M11 Jct 21-22 Arklow Gorey Bypass (Gorey-Arklow) |
9.5 |
Complete |
|
2007-10-15 |
M 1 |
M8 Jct 9-10 Cashel-Mitchelstown (Cashel-Cahir) |
12 |
Complete |
|
2008-03 |
HQDC |
N11 Jct 11 Kilpeddar/Delgany Jct |
0 |
Complete |
|
2008-05-29 |
M 1 |
M9 Jct 4-6 Carlow BP |
19 |
Complete |
|
2008-07-16 |
M 1 |
M6 Jct 5-8 Kilbeggan-Athlone |
28 |
Complete |
|
2008-07-25 |
M 1 |
M8 Jct 10-12 Cashel-Mitchelstown (Cahir-Mitchelstown) |
28 |
Complete |
|
2008-12-08 |
M |
M8 Old N8-Jct 4-7 Cullahill-Urlingford-Cashel |
40 |
Complete |
|
2009-05-25 |
M |
M8 Jct 12-14 Mitchelstown-Fermoy |
16 |
Complete |
|
2009-07-06 |
Widening to D3AP |
N4 Jct 1-5 M50-Leixlip Widening from 4 to 6 lanes |
5.5 |
Complete |
|
2009-07-23 |
M 2 |
M6 Jct 13-14 Athlone-Ballinasloe |
17 |
Complete |
|
2009-10-19 |
HQDC |
N25 Waterford BP |
17.8 |
Complete |
|
2009-12-17 |
M |
M7 Jct 24-26 Nenagh-Limerick (Nenagh BP) |
9.5 |
Complete |
|
2009-12-18 |
HQDC |
N6 Jct 19-20-Old N6 Ballinasloe-Galway |
5 |
Complete |
|
2009-12-18 |
M 2 |
M6 Jct 14-19 Ballinasloe-Galway |
51 |
Complete |
|
2009-12-21 |
M |
M9 Jct 2-4 Kilcullen-Carlow |
27 |
Complete |
|
2010-03-22 |
M 2 |
M9 Jct 9-12 Kilkenny-Waterford |
34 |
Complete |
|
2010-04-01 |
M |
M7 J26-27 Nenagh-Limerick (Birdhill-Nenagh) |
16.6 |
Complete |
|
2010-05-28 |
M |
M8 Jct 1-3-Old N8 M7/M8 Portlaoise (Aghaboe-Cullahill) |
14 |
Complete |
|
2010-05-28 |
M |
M7 Jct 18-21 M7/M8 Portlaoise (Portlaoise-Mountrath) |
26 |
Complete |
|
2010-06-04 |
M 2 |
M3 Clonee/North of Kells (Part 1) |
2.7 |
Complete |
|
2010-06-04 |
M |
M3 Clonee/North of Kells (Part 2) |
43 |
Complete |
|
2010-06-04 |
D2AP |
M3 Clonee/North of Kells (Part 3) |
12.6 |
Complete |
|
2010-07-27 |
HQDC |
N18 Jct 1-4 Limerick BP Ph.2 |
10 |
Complete |
|
2010-09-01 |
Widening |
M50 Jct 3-14 Widening and Interchange Upgrade |
32 |
Complete |
|
2010-09-09 |
M 2 |
M9 Jct 6-9 Carlow-Kilkenny |
30 |
Complete |
|
2010-09-28 |
M |
M7 J27-28 Nenagh-Limerick (Limerick-Birdhill) |
11.9 |
Complete |
|
2010-11-12 |
M 2 |
M18 Jct 14-16 Gort to Crusheen |
22 |
Complete |
|
2010-12-22 |
M |
M7 Jct 21-24 Castletown-Nenagh |
36 |
Complete |
|
2011-06-17 |
Widening |
M1 Jct 2-3 Airport-Drinan Widening from 4 to 6 Lanes |
2 |
Complete |
|
2013-06-30 |
Widening |
M1 Jct 3-4 Drinan-Lissenhall Widening from 4 to 6 Lanes |
4 |
Construction |
|
2013 |
HQDC |
N4 Jct 14 The Downs |
5 |
Construction |
|
2013-07 |
D2AP |
N22/N69/N70 Tralee Bypass |
8 |
Construction |
|
2013-09 |
HQDC |
N40 Bandon/Sarsfield Rds Grade Separation |
3 |
Construction |
|
2014-11 |
SC |
N5 Ballaghaderreen Bypass |
13.5 |
Construction |
|
2015-02 |
HQDC |
N7 Jct 1B(?) Newlands Cross |
2 |
Construction |
|
2015-09 |
M |
M11 Jct 17-20 Arklow to Rathnew |
16.4 |
Construction |
|
2016 |
HQDC |
N8 Jct 19 Dunkettle Int Upgrade |
0 |
Approved |
|
2017 |
D2AP |
N17 Tuam Bypass |
4.2 |
Tender |
|
2017 |
M 2 |
M17/M18 Oranmore-Galway-Tuam |
53.4 |
Tender |
|
2017 |
HQDC |
N25 New Ross Bypass |
3.6 |
Approved |
|
2017 |
D2AP |
N25 New Ross Bypass |
10 |
Approved |
|
2018 |
HQDC |
N6 Jct 20-22 Galway City Outer BP |
9.4 |
Awaiting Approval |
| 2019 |
M |
M11 Jct 24-26 Enniscorthy Bypass |
27 |
Approved |
| |
HQDC |
N22 Cork Northern Ring Road (M8-M20) |
10.4 |
Suspended |
|
|
M |
M20 Limerick-Cork (Southern Section) |
48 |
Suspended |
| 2020 |
D2AP |
N21 Adare Bypass |
8 |
Preliminary Design |
|
|
M |
M20 Limerick-Cork (Northern Section) |
48 |
Suspended |
| 2020 |
D2AP ? |
N22 Ballyvourney to Macroom |
21.5 |
Awaiting Approval |
|
2020 |
D2AP |
N11/N25 Oilgate to Rosslare Harbour |
35 |
Awaiting Approval |
|
|
HQDC ? |
N28 Ringaskiddy to Cork (N Section) |
11 |
Suspended |
|
|
D2AP ? |
N28 Ringaskiddy to Cork (S Section) |
2 |
Suspended |
|
2020 |
D2AP |
N17 Collooney to Tobercurry |
14 |
Preliminary Design |
|
2020 |
D2AP |
N24 Pallasgreen to Cahir |
37.5 |
Planning |
|
2020 |
D2AP/SC |
N81 Tallaght to Hollywood Cross |
27 |
Route Selection |
|
2020 |
D2AP ? |
N25 Waterford to Glenmore |
11 |
Planning |
|
2020 |
D2AP |
N5 Westport to Turlough |
27 |
Preliminary Design |
|
|
D2AP |
N15 Ballybofey / Stranorlar Bypass |
14.9 |
Suspended |
|
|
M |
M45? Leinster Outer Orbital Road |
74 |
Suspended |
|
HQDC ? |
N4 Mullingar - Longford - Rooskey |
50 |
Suspended |
|
|
D2AP |
N21 Adare - Abbeyfeale |
45 |
Suspended |
|
|
|
HQDC |
N25 Carrigtwohill to Midleton |
4.7 |
Suspended |
|
|
D2AP |
N17 Tuam to Claremorris |
23 |
Suspended |
|
|
D2AP |
N17 Tobercurry BP to Knock BP Ph 1 |
25.7 |
Suspended |
|
|
D2AP |
N17 Tobercurry BP (Tobercurry to Charlestown) |
10.2 |
Suspended |
|
|
D2AP ? |
N25 Midleton to Youghal |
18 |
Suspended |
|
|
D2AP ? |
N25 Dungarvan Bypass |
13.2 |
Suspended |
|
|
D2AP |
N15 Lifford to Stranorlar |
17 |
Suspended |
|
|
D2AP |
N15 Sligo to County Boundary (N Section) |
20 |
Suspended |
|
|
HQDC |
N15 Sligo to County Boundary (S Section) |
6 |
Suspended |
|
|
M |
M50 Eastern Bypass |
13 |
Suspended |
|
HQDC |
N22 Cork Northern Ring Road (M20-Ballincollig) |
9.6 |
Suspended |
|
| M | Motorway |
| HQDC | High Quality Dual Carriageway |
| D2AP/D3AP | All Purpose Dual Carriageway with 2 or 3 lanes each way |
| 2+1 | Two Lanes One Way/One Lane Other Way |
| SC | Single Carriageway |
| Year | Km that year | Total km | Notes |
| 1983 | 7 | 7 | |
| 1985 | 5.5 | 12.5 | |
| 1990 | 11.8 | 24.3 | |
| 1991 | 5.5 | 29.8 | |
| 1992 | 0 | 29.8 | |
| 1993 | 14.5 | 44.3 | |
| 1994 | 23.6 | 67.9 | |
| 1995 | 0 | 67.9 | |
| 1996 | 11 | 78.9 | |
| 1997 | 12.5 | 91.4 | |
| 1998 | 13 | 104.4 | |
| 1999 | 0 | 104.4 | |
| 2000 | 0 | 104.4 | |
| 2001 | 25 | 129.4 | |
| 2002 | 0 | 129.4 | |
| 2003 | 49.3 | 178.7 | Includes a 0.7 km downgrade |
| 2004 | 17 | 195.7 | |
| 2005 | 60.2 | 255.9 | |
| 2006 | 22.9 | 278.8 | Includes a 1.1 km downgrade |
| 2007 | 0 | 278.8 | |
| 2008 | 162 | 440.8 | Includes 47 km of redesignations |
| 2009 | 240.8 | 681.6 | Includes 120.3 km of redesignations |
| 2010 | 236.2 | 917.8 | |
| 2011 | 0 | 917.8 | |
| 2012 | 0 | 917.8 | |
| 2013 | 0 | 917.8 | |
| 2014 | 0 | 917.8 | |
| Estimates: | |||
| 2015 | 16.4 | 934.2 | |
| 2016 | 53.4 | 987.6 | |
| 2017 | 27 | 1014.6 | |
| 2018 | 9.4 | 1024 | |
| 2019 | 48 | 1072 | |
| 2020 | 48 | 1120 | |
| 2021 | 74 | 1194 | |